Ingeniería Industrial

China United Engineering Company, formerly known as the second Design Institute of mechanical industry, is one of the first large-scale comprehensive design institute of the new China, the country to undertake various types of machinery factory design and technical transformation tasks. In 1958, according to the division of the national industry, mainly responsible for power generation equipment manufacturing industry (boiler, steam turbine, power station auxiliary), general equipment manufacturing industry (fan, compressor, pump, valve, cooling machine, air separation equipment, vacuum equipment, separation equipment, plastic machinery, etc.) design and development planning, basic construction and technical transformation projects and instrument manufacturing industry, and undertake the design task related to the production of special equipment, automatic line test device, making contribution to the establishment of the system of China's machinery industry.

China United Engineering Company, formerly known as the second Design Institute of mechanical industry, is one of the first large-scale comprehensive design institute of the new China, the country to undertake various types of machinery factory design and technical transformation tasks. In 1958, according to the division of the national industry, mainly responsible for power generation equipment manufacturing industry (boiler, steam turbine, power station auxiliary), general equipment manufacturing industry (fan, compressor, pump, valve, cooling machine, air separation equipment, vacuum equipment, separation equipment, plastic machinery, etc.) design and development planning, basic construction and technical transformation projects and instrument manufacturing industry, and undertake the design task related to the production of special equipment, automatic line test device, making contribution to the establishment of the system of China's machinery industry.

Power generation equipment, Chinese United counterpart service general equipment and other industries are major national technology and equipment with large, heavy load and high speed, high pressure, high temperature, high precision, high torque, high impact performance and characteristics. Casting, forging, for major components of blank finishing, large steel structure, container welding, heat treatment, test device of thick wall parts and fittings required for nondestructive testing, is the key to ensure the performance and quality of the products, is an important problem to be solved in engineering design and construction. For decades, the United China adhere to the analysis of the technology of key technology, the use of advanced technology and equipment, development of special test equipment and special equipment development, such as steam turbine, gas turbine, compressor, turbine pump, valves and other large machinery, machine testing device, large heat treatment device, large parts of welding equipment. In the aspect of solving hundreds of tons of heavy plant crane lifting capacity, super large equipment base, special structure design and corresponding utilities and other special technical problems to overcome many difficulties, reached the international advanced level.

Main Awards

Department of Industrial Engineering: 0571-88151971

No.1 Industrial Engineering Design Institute

General Administration Office: 88155027/88155023(FAX)

Production Process Unit 88151870/1896/5024/1867

Office of the Chief Senior Engineer: 88151867/1870/5024

Office of Master Plan & Technological-Economic Budgets: 88155024

Architecture Unit 88155028

Structure Unit 88151878

Unit of Public Works 88151890

No.2 Industrial Engineering Design Institute

General Administration Office: 88151863/88155684(FAX)

Office of Marketing 88155750

Office of Chief Senior Engineer 88151865/81185269

Production Process Unit 88155672/81185267/5268

Office of Master Plan 88151872

Office of Technological-Economic Budgets 81185267

Architecture Unit 88155659/5660/81185265/5266

Structure Unit 88151889/5030/5735/81185270

Public Works Unit - Division of Water Supply & Drainage 88151875

Public Works Unit - Division of Electrics

Public Works Unit - Division of Heating & Ventilation

No.3 Industrial Engineering Design Institute

General Administration Office: 88151891(TEL&FAX)

Production Process Unit 88155026/5734

Architecture Unit 88151879

Structure Unit 88155025

Public Works Unit 88151892

Industrial & Logistics Engineering Design Institute

General Administration Office 88151888/81185408/81185458(FAX)

Office of Chief Senior Engineer 88151866

Production Process Unit 88151869/81185254/5255/5256

Logistics & Commercial Engineering Unit 88155736

Office of Master Plan 81185259

Office of Logistics & Automation Equipment

Architecture Unit 88153196/1953/81185250/5251

Structure Unit 88151877/5032/ 81185248/5249

Public Works Unit - Division of Heating & Ventilation 81185253

Public Works Unit - Division of Electrics 81185252/88151874

Public Works Unit - Division of Water Supply & Drainage

Beijing Design Institute 88153191/88151986 (FAX)

Anhui Design Institute 88155675 (FAX)

Mapa del sitio|Información del contacto

Zhe ICP No.19043761-1  Copyright © 2016 www.chinacuc.com Todos los derechos reservados.